#810- River S Bridge Replacement

#810- River S Bridge Replacement

The scope of this project is building a new, concrete 2 lane bridge that goes over the river and the BNSF Railroad. It will replace the wooden single lane bridge into the reserve. This project is in Ridgefield, WA at the National Wildlife Refuge and is scheduled for completion in mid 2020. Keep up with [...]
Read more
#760 – Sea-Tac

#760 – Sea-Tac

Connecting 28th Ave & 24th Ave This $14 million dollar contract consists of moving more than 130,000cy (cubic yards) of material. Also includes installing soldier pile walls, structural earth walls, illumination, traffic systems, a 130ft bridge and a new tunnel for 509; of which is being extended through our site. Follow us at https://www.facebook.com/Ceccantiinc/ Read the [...]
Read more
#748 – Belfair Widening

#748 – Belfair Widening

https://youtu.be/1cGsxKT_Eq0 Project consists of widening roadway for two lanes to three, clearing, grubbing, roadway excavation, embankment compaction, drainage, surfacing, paving with HMA, erosion control, constructing cement concrete curb, gutter & sidewalk, retaining walls, driveways, storm water detention ponds, pavement marking, illuminatiOn systems, permanent signing, signal systems and traffic control. Project Photos
Read more
#747 – Point Defiance Regional Treatment Retrofit

#747 – Point Defiance Regional Treatment Retrofit

Construct stormwater flow splitter system, conveyance, pretreatment system, concrete cascade pools, distribution troughs, high flow treatment cells, landscaping, and irrigation. Stockpiling approximately 22,000 cy of contaminated soil on site and removing approximately 73,000 cy of clean soil excavation, utility constructing approximately 1,150 lf of storm sewer and the replacement of an existing outfall with a [...]