This project will construct a system to treat stormwater runoff, this project will also include construction of water quality treatment cells in the existing Rody Pond to filter currently untreated discharge entering the creek from three outfalls from the surrounding neighborhood. A sediment collection cell will be added at the upstream end of the pond to capture sediment. The existing discharge point from the pond will be modified to provide more stormwater detention during high flows, which will increase flood capacity and reduce in-stream erosion. The pond will also be planted like a wetland to provide additional water quality treatment and improve aesthetics.