Schedule 1 consists of construction of 4,300 ft of new setback levee and drainage ditch along the east side of the Puyallup river, partial removal of 1,710 ft of existing levee, and removal of 620 ft. of existing 24-42″ diameter storm sewer pipe. Project includes approximately 36,000 cy of excavation; 131,000 tons of import levee fill; and 75,000 tons of quarry spalls, riprap, toe rock, and/or jetty stone.

Schedule 2 consists of construction of 7,500 ft. of new setback levee and drainage ditch along the east side of the Puyallup river, and partial removal of approximately 5,000 ft of existing levee. Project includes approximately 90,000 cy of excavation, 228,000 tons of import levee fill and 137,000 tons of quarry spalls, riprap, toe rock, and/or jetty stone.