#877 - SOUTH TACOMA PUMP STATION REHABILITATION PAHSE 2
This project will be a team effort between subcontractors and Ceccanti to perform bypass pumping, removal and replacement of four existing pumps Nos. 1–4 and electrical and instrumentation modifications including the installation of four variable frequency drives, level control instruments and related control modifications. Work will also include excavation and dewatering for the installation of a Bypass Structure, appurtenances, and connecting pipe adjacent and upstream of the pump station. Cleaning, inspection, and repair of wet well concrete substrate and coating of this and other structures at the site are to be done. Equipment provided by the Ceccanti will include one spare motor to match the motors with the motors of the four pumps to be provided by the Owner.
CLIENT - CITY OF TACOMA
PROJECT MANAGER - BILL PARSONS
LOCATION - TACOMA, WA
VALUE - $4,571,000
START DATE - JANUARY 2024